• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Saturday, July 18, 2026
Newsletter
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
Home Water & wastewater

Alkimos desalination pipeline reaches halfway mark

by Tom Parker
June 17, 2026
in News, Water & wastewater
Reading Time: 2 mins read
A A
Alkimos pipeline

Image: Water Corporation

Share on FacebookShare on Twitter

Water Corporation has reached the halfway mark in delivering a 33.5km pipeline to connect the $2.8 billion Alkimos seawater desalination plant with the Wanneroo Reservoir.

With an internal diameter of 1.6m, the trunk main is one of the largest water pipelines ever constructed in WA and has been designed to support future expansion of the desalination plant.

The steel, cement-lined pipeline is being manufactured locally by Steel Mains in Kwinana using Pilbara iron ore and Cockburn cement, and is expected to have an operational lifespan of around 120 years.

Almost 1600 pipe sections ranging from 6m to 12m in length have been installed so far, with each 12m section weighing close to nine tonnes.

Once complete, the Alkimos seawater desalination plant will become WA’s third seawater desalination facility, initially delivering 50 billion litres of drinking water each year while supporting more than 1500 jobs during construction.

The trunk main will transfer water from the plant via the Carabooda Tank, future Nowergup Tank and Wanneroo Reservoir before connecting to the broader water supply network.

Its large diameter has been designed to improve pumping efficiency, reducing energy demand and lowering greenhouse gas emissions by 21 per cent compared with a smaller pipeline.

The trunk main is being delivered by the Alkimos Pipeline Alliance, comprising Water Corporation, Georgiou Group and DM Civil, and is scheduled for completion in 2027. The route has been developed in consultation with local stakeholders to minimise impacts on the environment and surrounding communities.

WA Premier Roger Cook said the project showcased the benefits of the state’s Made in WA plan.

“Not only will it be built with products and materials sourced from local businesses, it will also be a key part of our Alkimos desalination plant, which when built will support hundreds of jobs while supplying households and businesses with water that is Made in WA,” he said.

Subscribe to Pump Industry to discover all the latest industry news, technical articles and thought-leading content from Australia’s only dedicated pump magazine.

Find Related Companies In The Pump Industry Capability Guide


KSB Australia
Assett Mechanical Engineering
Flo-Max Pumps

Related Posts

WA Mining Conference

Hancock Iron Ore and Fortescue join WA Mining Conference speaker lineup

by Tom Parker
July 16, 2026

The WA Mining Conference & Exhibition 2026 is taking shape, with a powerful lineup of industry leaders confirmed for the...

Western Port recycled water scheme

Don’t miss your chance to nominate for the Utility Awards

by Tom Parker
July 16, 2026

The Utility Awards nominations close on August 7, so now is the time to recognise outstanding people, projects, and innovations...

Traralgon Western Distribution Main

This $10.5m project is boosting water security in Traralgon

by Tom Parker
July 15, 2026

Construction on the $10.5 million Traralgon Western Distribution Main project will get underway in the coming weeks, connecting the Traralgon water...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.



Pump Industry is Australia’s only dedicated pump magazine and is produced by Prime Creative Media in cooperation with Pump Industry Australia (PIA).

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Pump Industry

  • About
  • Advertise
  • Subscribe
  • Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Pump school
  • Water & wastewater
  • Irrigation

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Technical
    • Standards
  • Pump school
    • Pump school
    • Ask an Expert
  • Sectors
    • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited