Features Pipeline to Prosperity: building infrastructure for Tasmania’s irrigation future July 29, 2021
Chemicals and plastics Optimising the Bonny Hills Wastewater Treatment Plant to cater for population growth April 30, 2021
Engineering Increasing transfer capacity to secure water for the northern section of the SEQ water grid April 28, 2021
Construction Designing a hydraulic system to power the tallest man-made waterfall in the Southern Hemisphere April 16, 2021