Coliban Water (VIC) is seeking expressions of interest for the design and construction of water tanks and pump stations at various sites within the Coliban Water region.
The tanks and the pump stations are planned to be delivered between 2019 and 2023.
Submissions for expression of interest close 23 July 2019.