• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Sunday, December 14, 2025
Newsletter
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
Home

Ichthys project receives mooring installation

by Pumps Journalist
May 18, 2015
in LNG, News, Oil & gas
Reading Time: 3 mins read
A A
The first of 49 foundation piles was safely deployed and driven into the seabed on Wednesday 6 May 2015 at the Ichthys Field in the Browse Basin marking the start of mooring installation works for the INPEX-operated Ichthys LNG Project

The first of 49 foundation piles was safely deployed and driven into the seabed on Wednesday 6 May 2015 at the Ichthys Field in the Browse Basin marking the start of mooring installation works for the INPEX-operated Ichthys LNG Project

Share on FacebookShare on Twitter

Mooring installation works have begun at the Ichthys Field in the Browse Basin (WA) as part of the INPEX-operated Ichthys LNG Project.

Located 220km offshore of Western Australia, the first of 49 foundation piles was safely deployed and driven into the seabed in a water depth of 250 metres. Each pile is about 66 metres long and weighs more than 450 tonnes.

Ichthys Project Managing Director, Louis Bon, said that installation of the complex network of subsea infrastructure and equipment across the 800 square kilometre Ichthys Field was progressing well.

“The mooring installation works are part of the offshore installation campaign that the Ichthys LNG Project commenced in October 2014,” Mr Bon said.

“As part of that campaign, we are installing more than 30,000 tonnes of subsea infrastructure and equipment across the Ichthys Field so that we will be able to safely and efficiently extract gas and condensate.”

“The mooring work is being carried out specifically to prepare for the arrival of the Project’s two big offshore facilities – the central processing facility and the floating production, storage and offloading facility.”

Currently under construction in South Korea, the central processing facility (CPF) and floating production, storage and offloading (FPSO) facility, once completed, will be towed to the Ichthys Field in 2016 and moored for the life of operations – about 40 years – by 40,000 tonnes of chain secured to about 20,000 tonnes of foundation piles.

The mooring installation work scope is being led by Heerema Marine Contractors (HMC) Australia – under subcontract to the lead contractor McDermott Australia – using the deepwater construction vessel DCV Aegir.

Moorings will be installed by DCV Aegir in non-continuous phases, with piles driven first and mooring chains laid out later in the campaign.

As of May 2015, the Ichthys LNG Project had installed 47 kilometres of flowlines, more than 30 flowline sleeper structures and a 6500 tonne riser support structure (RSS) in the Ichthys Field as part of the offshore installation campaign.

Find LNG Related Companies In The Pump Industry Capability Guide


Kelair Pumps Australia
EagleBurgmann Australasia
Cummins South Pacific

Related Posts

Dingley Recycled Water Scheme

Melbourne’s 1.8-billion-litre recycled water scheme

by Tom Parker
December 10, 2025

The Victorian Government and South East Water are looking to unlock economic opportunities in Melbourne’s south-east through the Dingley Recycled...

refrigerant handling

How to report refrigerant handling incidents in the HVAC sector

by Tom Parker
December 4, 2025

The Australian Refrigeration Council (ARC) has launched a new ‘Report a Breach’ form on the ARCtick website, making it easier for...

Flexaseal RKCS slurry seals successfully operating in heavy-duty high head slurry pumps. Image: Flexaseal

How Flexaseal is redefining reliability in slurry pump seal solutions

by Tom Parker
December 4, 2025

In Australia’s mining industry, the true test of performance isn’t how equipment runs under ideal conditions – it’s how it...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.



Pump Industry is Australia’s only dedicated pump magazine and is produced by Prime Creative Media in cooperation with Pump Industry Australia (PIA).

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Pump Industry

  • About
  • Advertise
  • Subscribe
  • Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Pump school
  • Water & wastewater
  • Irrigation

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited