Dynapumps has completed one of its biggest fire pump supply packages yet. LNG fire water pumps were supplied for the Wheatstone LNG liquefied natural gas plant currently under construction in Western Australia.
All up, three packages were supplied. The first consisted of three diesel pump sets, two fitted with jockey pumps, 800L double skinned fuel tanks and a cooling loop fitted for engine heat exchangers. The second fire water pump package contained one electric pump set with jockey pump, two diesel pump sets both with 800L double skinned fuel tanks one with jockey pump and one without. A cooling loop was fitted for engine heat exchangers.The third package contained two diesel engine systems both fitted with acoustic enclosures to ensure sound levels stay below 85dBA as required, one electric system and one dual jockey pump system with controller and piping.