Share

A rollout of approximately 3700 water meters has begun in the Mildura, Red Cliffs and Merbein irrigation districts in Sunraysia (VIC) as part of the Sunraysia Modernisation Project. The $120 project is a joint initiative between the Commonwealth & Victorian State governments and Lower Murray Water (LMW) and involves upgrades to pump stations, irrigation systems and various other water infrastructure.

As a part of SMP, approximately 2500 Domestic and Stock meters and 1200 irrigation meters will be upgraded and/or installed to:

• Enable the National Metering Institute standards and objectives to be met;

• Deliver consistent metering methods across all districts;

• Enable improved operation of the irrigation system through the modernisation of the

metering fleet; and

• Provide the availability of real-time metering information for irrigation customers.

The metering works will involve upgrading all irrigation meters to electromagnetic flow meters; the standardisation of meter sizes and outlet arrangements; the installation of irrigation meters prior to customers’ pump stations; replacing active Dethridge wheel outlets; metering any unmetered supplies; and the installation of telemetry to all irrigation outlets.

The metering works are expected to be complete by the end of October, 2015.

 

 

Find Irrigation Related Companies In The Pump Industry Capability Guide



Related articles
0 Comments

©2024 Pump Industry. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

or    

Forgot your details?

Create Account