• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Saturday, July 11, 2026
Newsletter
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
Home News

Origin makes farm-in agreement for prospective Canning Basin permits

by Imogen Hartmann
January 11, 2021
in News, Oil & gas, Projects, Spotlight
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

Origin Energy and Buru Energy have agreed to a farm-in for seven permits, which will span 20,000km2 in the prospective Canning Basin in Western Australia.

Under the agreements, Origin secures a 50 per cent equity share in five permits with Buru Energy, and a 40 per cent equity share in two permits with Buru and Rey Resources (Rey) in exchange for carrying $12.3 million of their share of work program costs. 

The total estimated spend by Origin over a two-year period is expected to be approximately $35 million inclusive of a two-well drilling program and seismic work.

Origin also has contingent options to carry an additional $10.6 million of Buru and Rey’s costs over a four-year period. Origin has the option to assume operatorship for any significant gas development, as well as any carbon capture and storage development.

Origin Executive General Manager Integrated Gas, Mark Schubert, said, “We are excited by this opportunity to take an interest in one of Australia’s material onshore exploration and production basins, at an attractive entry cost where significant work has already been undertaken, giving it a short timeline to value.

“Origin will now hold positions in three large prospective onshore basins – the Beetaloo, Canning, and Cooper-Eromanga – giving us exposure to conventional and unconventional gas plays, and what we believe are the most prospective shale formations in Australia.

“Our interest in these seven permits lies in the strength of the gas resources following extensive analysis of the basin, and the longer-term potential for carbon capture and storage.

“Our Canning Basin acreage position will also give us exposure to value uplift from the activity of other explorers adjacent to our permit areas, with the option to supply gas for LNG backfill and to customers in domestic and regional markets.

“As action to combat climate change continues to accelerate globally, including customer-led demand for clean energy, in making this investment we have given significant consideration to the pathways available to green the gas over time, including carbon capture and storage and offsets, to support Origin’s ongoing decarbonisation objectives.

“Gas remains core to our strategy and the global and domestic energy mix, as it can help drive the transition to lower emissions faster by supporting intermittent renewables and replacing more carbon intensive fuels.

“We are looking forward to working with Buru, which is a long established operator in the Canning Basin.”

Find Related Companies In The Pump Industry Capability Guide


United Pumps Australia
Assett Mechanical Engineering
NETZSCH Australia

Related Posts

Nambucca sewage pump station

Construction begins on new Nambucca Heads sewage pump station

by Tom Parker
July 9, 2026

The first stage of a project set to increase the Nambucca Valley economy by $380 million per year involves the...

Unitywater Maroochydore

Unitywater overhauls Maroochydore wastewater treatment plant

by Tom Parker
July 8, 2026

Unitywater said it is well advanced in its five-year renewal of the Maroochydore wastewater treatment plant.

Yarra Valley Water net-zero

Yarra Valley Water hits net-zero milestone four years ahead of schedule

by Tom Parker
July 8, 2026

Yarra Valley Water is paving the way for decarbonisation in the water sector, hitting net-zero operational emissions four years ahead...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.



Pump Industry is Australia’s only dedicated pump magazine and is produced by Prime Creative Media in cooperation with Pump Industry Australia (PIA).

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Pump Industry

  • About
  • Advertise
  • Subscribe
  • Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Pump school
  • Water & wastewater
  • Irrigation

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Technical
    • Standards
  • Pump school
    • Pump school
    • Ask an Expert
  • Sectors
    • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited