Power and Water Corporation have awarded McConnell Dowell a contract for a lateral pipeline that will extend from the existing Wickham Point Pipeline to the new Inpex Gas Plant in Darwin, Northern Territory.
The scope of works for this project includes the design, procurement, construction, and commission of metering skids and interconnecting 150mm 12” pipeline for gas transmission.
Design work will commence immediately with commissioning scheduled to begin in September 2015.