Seqwater (QLD) is seeking proposals for the provision of design and construction services for the Molendinar Water Treatment Plant Backwash System and Electrical Upgrade Project.
Broadly, the Scope of Work for this project consists of the following:
- Changes to the existing backwash system – pump and blower replacement and pipework modifications
- Changes to the fire service water system
- Changes to the existing electrical system – switchroom and switchboard upgrades
- Provision of new back-up power system
- Removal of redundant mechanical, electrical and civil equipment and infrastructure
- Modifications to the Control System and SCADA
Submissions to tender close 26 October 2017.