Douglas Shire Council (QLD) is seeking tenders for the design and construction of a new Backwash Recovery system at the Mossman Water Treatment Plant.
The Backwash Recovery system shall consist of a Dual Media Pressure Filter plant and associated equipment.
The Filter Plant shall have a capacity to filter backwash water. The Filter Plant shall be operated 24 hours per day, 7 days per week.
The proposed Backwash Recovery Filter Plant is to be constructed on the Mossman Water Treatment Plant site (Gorge View Crescent, Mossman, QLD)
Submissions to tender close 28 July 2017.