• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Thursday, January 22, 2026
Newsletter
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
No Results
View All Results
Home

Extending the life of vital infrastructure

by Pumps Journalist
September 1, 2015
in News, Pipelines, Water & wastewater
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

The Western Australian State Government will soon begin work to refurbish wastewater pipes in Victoria Park, which is expected to extend the life of this vital infrastructure by at least 50 years.

Water Minister, Mia Davies, said the $4.93 million Water Corporation project formed part of an ongoing program of work to reline and refurbish wastewater pipes across the State.

“About four kilometres of wastewater pipe in Victoria Park will be refurbished over the coming year,” Ms Davies said.

“Water Corporation uses trenchless technology to reline wastewater pipes where possible. Trenchless technology avoids widespread excavation to access the wastewater pipes, which minimises disruption to the community and road users.

“The process involves inserting a liner inside an existing pipe via an access chamber, resulting in a replacement pipe with a smooth and continuous inner surface. This work will reduce the likelihood of blockages and overflows.”

The Minister said the corporation would work closely with residents throughout the duration of the project.

“Residents in the area will notice an increase in activity along the pipeline route and some local traffic management, however the corporation will ensure disruption is kept to a minimum,” she said.

“I thank residents in advance for their co-operation throughout the work, which is expected to take about 10 months to complete.”

For more information about the project, visit the Water Corporation website.

Fact file

  • The corporation manages more than 16,000km of wastewater mains across WA – with more than 12,000km in the Perth metropolitan area
  • Every year, the corporation collects, treats and safely disposes of about 167.5 billion litres of wastewater
  • Wastewater is 99.97 per cent water and comes mostly from showers, baths and washing machines

Find Related Companies In The Pump Industry Capability Guide


SEEPEX Australia
SEEPEX Australia
SEEPEX Australia

Related Posts

Image: rh2010/stock.adobe.com

Heat pump installers to benefit from ARC pilot

by Tom Parker
January 15, 2026

A new pilot is providing practical education and on-site support for independent Refrigerant Handling Licence (RHL) holders involved in heat...

water bushfires

Utilities rush to reinstate water supply in fire-ravaged communities

by Tom Parker
January 15, 2026

Victorian utilities are working to restore water services across the state following recent bushfires, which have burnt through more than...

Image: Motion

Timken solid-block housed units are built for the tough stuff

by Staff writer
January 15, 2026

Harsh mining conditions demand more from your bearings. That’s why Motion recommends Timken solid-block housed units – a rugged, factory-assembled...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.



Pump Industry is Australia’s only dedicated pump magazine and is produced by Prime Creative Media in cooperation with Pump Industry Australia (PIA).

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Pump Industry

  • About
  • Advertise
  • Subscribe
  • Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Pump school
  • Water & wastewater
  • Irrigation

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Open tenders and opportunities
    • Contracts and tenders awarded
  • Technical
    • Standards
  • Pump school
    • Ask an Expert
  • Sectors
    • LNG
    • Coal Seam Gas (CSG)
    • Building Services
    • Energy Efficiency
    • Valves
    • Reliability
    • Chemicals and plastics
    • Irrigation
    • Mining
    • Water & wastewater
  • Magazine
  • Capability Guide
  • About
  • Advertise
  • Subscribe
  • Contact
  • Events

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited