Share

Mount Gibson Iron are installing a new 560 kW dewatering pump pontoon in their Koolan Island open pit for dewatering. Petro Min Engineers are responsible for the electrical and controls design for the pump power supply, pump starters, detailed design and the telemetry system.

The starter uses a 1000 Volt Solcon Soft Starter from Sundrive and Miri RTU’s for the telemetry system.

The Koolan Island hematite mining operation is located approximately 140 kilometres north of Derby in Yampi Sound, off the northern Kimberley coast of Western Australia. Almost 70-million tonnes of high-grade (Fe @ 67{87a03eb4327cd2ba79570dbcca4066c6d479b8f7279bafdb318e7183d82771cf}) iron ore were mined by BHP from Koolan Island from 1959 to 1993.

pontoon1

pontoon2

The August edition of Pump Industry contains a feature on mine dewatering. Click here to read the August edition online.

Find Mining Related Companies In The Pump Industry Capability Guide



Related articles
0 Comments

©2024 Pump Industry. All rights reserved

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

or    

Forgot your details?

Create Account